The storage charging assembly for wall installation is available in different versions. The integrated storage charging pump is speed-controlled (PWM) so that charging with the modulating x-change dynamic (pro) heat pump series can take place efficiently and in line with demand in every operating mode. The components are already pre-assembled on a platform and the insulation is also included.
The “unmixed heating circuit” group consists of a circulation pump (delivery head 6 m or 9 m) and the corresponding shut-off devices. The “mixed heating circuit” group also has a mixer. These components are already pre-assembled on a platform and insulation is also included.
The fresh water station for wall installation in available in 4 different versions. The electronically controlled hot water preparation is based on the continuous flow principle, ensuring that hot water is heated as hygienically as possible and in line with demand. The speed-controlled charge pump regulates the set tap temperature quickly and efficiently. The modbus interface for direct communication with the Kermi® x-center® controller ensures maximum ease of operation via the heat pump control – optionally, up to 4 fresh water stations can be combined in a cascade
A cascade set is needed for each additional fresh water station. A maximum of four fresh water stations can be combined in total For the installation of a fresh water cascade, a fresh water station with circulation is used as master, each additional slave station is executed without circulation.
Finally the new Kermi heating system has been installed. Or the Kermi ventilation system. Nothing left to stop you feeling cosy at home. With our 5-year system warranty, we are happy to prove the quality of our products and our service promise to you.
1. Have the Kermi system installed by a specialist company
2. Have Kermi Customer Service commission the system (or in the case of ventilation systems, a specialist company)
3. Annual servicing by Kermi Customer Service or by a specialist company